{"id":10506,"date":"2025-12-02T06:00:35","date_gmt":"2025-12-02T06:00:35","guid":{"rendered":"https:\/\/www.kscranegroup.com\/?post_type=posts&#038;p=10506"},"modified":"2025-12-02T06:00:38","modified_gmt":"2025-12-02T06:00:38","slug":"kuangshan-supports-bridge-construction","status":"publish","type":"posts","link":"https:\/\/www.kscranegroup.com\/cs\/posts\/kuangshan-supports-bridge-construction\/","title":{"rendered":"Port\u00e1lov\u00fd je\u0159\u00e1b KUANGSHAN CRANE s nosnost\u00ed 500 tun pom\u00e1h\u00e1 p\u0159i stavb\u011b mostu Ma&#39;anshan"},"content":{"rendered":"<p>Port\u00e1lov\u00fd je\u0159\u00e1b s nosnost\u00ed 500 tun vyroben\u00fd na\u0161\u00ed spole\u010dnost\u00ed ned\u00e1vno pomohl spole\u010dnosti China Railway No.9 Bridge Engineering Co., Ltd. k \u00fasp\u011b\u0161n\u00e9mu absolvov\u00e1n\u00ed prvn\u00edho kola celkov\u00e9 p\u0159ej\u00edmky ocelov\u00e9 v\u011b\u017ee Z3 mostu Ma&#39;anshan-Jangtze-Rail-and-Road, co\u017e p\u0159edstavuje dal\u0161\u00ed nov\u00fd pr\u016flom v \u010d\u00ednsk\u00e9 mostn\u00ed konstrukci.<\/p>\n\n\n\n<p>Spole\u010dnost KUANGSHAN CRANE, kl\u00ed\u010dov\u00fd dodavatel za\u0159\u00edzen\u00ed pro tento superprojekt, pou\u017eila pro zved\u00e1n\u00ed mostn\u00edch konstrukc\u00ed, jako jsou hlavn\u00ed ocelov\u00e9 v\u011b\u017ee projektu, v\u00edce ne\u017e 10 jednotek (sad) vysoce kvalitn\u00edch je\u0159\u00e1b\u016f, v\u010detn\u011b model\u016f o nosnosti 500 tun a 400 tun, kter\u00e9 poskytuj\u00ed silnou oporu pro v\u00fdstavbu \u017eelezni\u010dn\u00edho a silni\u010dn\u00edho mostu p\u0159es \u0159eku Jang-c&#39;-\u0165iang. Uv\u00e1d\u00ed se, \u017ee most m\u00e1 t\u0159\u00edv\u011b\u017eovou konstrukci se dv\u011bma hlavn\u00edmi poli s jedn\u00edm rozp\u011bt\u00edm 1120 metr\u016f a souvislou d\u00e9lkou dvojit\u00e9ho pole 2240 metr\u016f, co\u017e z n\u011bj \u010din\u00ed jeden z nejv\u011bt\u0161\u00edch t\u0159\u00edv\u011b\u017eov\u00fdch zav\u011b\u0161en\u00fdch most\u016f na sv\u011bt\u011b.<\/p>\n\n\n\n<p>V n\u00e1vaznosti na podporu mostn\u00edch projekt\u016f na n\u00e1rodn\u00ed \u00farovni, jako jsou most Jianzhou, most p\u0159es \u0159eku Yangtze v Changtai a most p\u0159es \u0159eku Yangtze v Zhangjinggao, se spole\u010dnost KUANGSHAN CRANE op\u011bt ujala d\u016fle\u017eit\u00e9ho posl\u00e1n\u00ed \u201eVelk\u00e9 t\u011b\u017ek\u00e9 stroje, inteligentn\u00ed v\u00fdroba pro siln\u00fd n\u00e1rod\u201c. S vyu\u017eit\u00edm sv\u00fdch vynikaj\u00edc\u00edch inteligentn\u00edch v\u00fdrobn\u00edch schopnost\u00ed, pokro\u010dil\u00fdch technologick\u00fdch v\u00fdhod a zlep\u0161en\u00e9 kvality slu\u017eeb urychlila v\u00fdstavbu \u017eelezni\u010dn\u00edho a silni\u010dn\u00edho mostu Ma&#39;anshan p\u0159es \u0159eku Yangtze a p\u0159isp\u011bla silou spole\u010dnosti KUANGSHAN CRANE k integrovan\u00e9mu rozvoji delty \u0159eky Jang-c&#39;-\u0165iang.<\/p>","protected":false},"excerpt":{"rendered":"Ned\u00e1vno pomohl port\u00e1lov\u00fd je\u0159\u00e1b o nosnosti 500 tun vyroben\u00fd na\u0161\u00ed spole\u010dnost\u00ed spole\u010dnosti China Railway No.9 Bridge Engineering Co., Ltd. s \u00fasp\u011b\u0161n\u00fdm absolvov\u00e1n\u00edm prvn\u00edho kola celkov\u00e9 p\u0159ej\u00edmky ocelov\u00e9 v\u011b\u017ee Z3 \u017eelezni\u010dn\u00edho mostu Ma&#39;anshan Yangtze River-River-West, co\u017e znamenalo dal\u0161\u00ed nov\u00fd pr\u016flom v \u010d\u00ednsk\u00e9 mostn\u00ed konstrukci. Jako kl\u00ed\u010dov\u00fd dodavatel za\u0159\u00edzen\u00ed pro [\u2026]","protected":false},"featured_media":10509,"parent":0,"menu_order":0,"template":"single-blog.php","posts_category":[15],"posts_tag":[118,86],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/xmxposts\/10506"}],"collection":[{"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":2,"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/xmxposts\/10506\/revisions"}],"predecessor-version":[{"id":10510,"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/xmxposts\/10506\/revisions\/10510"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/media\/10509"}],"wp:attachment":[{"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/media?parent=10506"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/posts_category?post=10506"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/cs\/wp-json\/wp\/v2\/posts_tag?post=10506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}