{"id":11377,"date":"2026-04-11T06:16:35","date_gmt":"2026-04-11T06:16:35","guid":{"rendered":"https:\/\/www.kscranegroup.com\/?post_type=posts&#038;p=11377"},"modified":"2026-04-11T06:16:38","modified_gmt":"2026-04-11T06:16:38","slug":"overhead-crane-for-srilanka-power-plant","status":"publish","type":"posts","link":"https:\/\/www.kscranegroup.com\/es\/posts\/overhead-crane-for-srilanka-power-plant\/","title":{"rendered":"Gr\u00faa puente de 7,5 toneladas para central el\u00e9ctrica de Sri Lanka: cumple con la normativa CEB y es anticorrosiva."},"content":{"rendered":"<p>Este caso involucra un proyecto de entrega completo por parte de KUANGSHAN CRANE para una gr\u00faa de 7,5 toneladas. <a href=\"https:\/\/www.kscranegroup.com\/es\/single-girder-overhead-cranes\/\">Puente gr\u00faa monorra\u00edl europeo<\/a> Suministrado al almac\u00e9n de equipos el\u00e9ctricos de la central el\u00e9ctrica de Lakvijaya en Sri Lanka.<\/p>\n\n\n\n<p>El proyecto cumpli\u00f3 estrictamente con las especificaciones de la licitaci\u00f3n LV\/T\/2024\/0001 emitidas por la Junta de Electricidad de Ceil\u00e1n (CEB). El dise\u00f1o t\u00e9cnico y la aceptaci\u00f3n se realizaron de acuerdo con la norma BS 466:1984, est\u00e1ndar para gr\u00faas puente el\u00e9ctricas generales. Adem\u00e1s, se implement\u00f3 una personalizaci\u00f3n anticorrosi\u00f3n especializada para hacer frente a las condiciones de alta humedad y alta salinidad propias de la regi\u00f3n costera occidental de Sri Lanka.<\/p>\n\n\n\n<p>Desde el dise\u00f1o, la fabricaci\u00f3n, la inspecci\u00f3n y la log\u00edstica hasta la instalaci\u00f3n, la puesta en marcha y las pruebas de carga, el proyecto se llev\u00f3 a cabo mediante un proceso integral de circuito cerrado. El equipo super\u00f3 con \u00e9xito la homologaci\u00f3n oficial de la CEB en un solo intento y ahora funciona de forma fiable en el almac\u00e9n de la central el\u00e9ctrica.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Antecedentes del proyecto: Proyecto de licitaci\u00f3n de la industria energ\u00e9tica de Sri Lanka<\/h2>\n\n\n\n<p>Esta adquisici\u00f3n forma parte de una licitaci\u00f3n oficial emitida por la Junta de Electricidad de Ceil\u00e1n (CEB), aplicada a una base nacional clave de energ\u00eda t\u00e9rmica: el almac\u00e9n de equipos el\u00e9ctricos de la central el\u00e9ctrica de Lakvijaya.<\/p>\n\n\n\n<ul>\n<li>Escenario de aplicaci\u00f3n: Manipulaci\u00f3n de equipos el\u00e9ctricos en interiores<\/li>\n\n\n\n<li>Condiciones ambientales: Zona costera con alta humedad y alta salinidad.<\/li>\n\n\n\n<li>Restricciones del proyecto: Debe cumplir simult\u00e1neamente con los procedimientos de licitaci\u00f3n de CEB y las normas t\u00e9cnicas BS 466:1984.<br><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Cumplimiento de las normas de licitaci\u00f3n de CEB<\/h3>\n\n\n\n<p>Este proyecto se ejecut\u00f3 de acuerdo con:<\/p>\n\n\n\n<ol>\n<li>Especificaci\u00f3n de licitaci\u00f3n de CEB LV\/T\/2024\/0001<br>Abarca los procedimientos de licitaci\u00f3n, la ejecuci\u00f3n del contrato, las garant\u00edas de cumplimiento, los hitos de pago y los procesos de aceptaci\u00f3n oficial.<\/li>\n\n\n\n<li>Norma BS 466:1984 para gr\u00faas puente el\u00e9ctricas<br>Abarca el dise\u00f1o estructural, los requisitos de fabricaci\u00f3n, las tolerancias de instalaci\u00f3n, las configuraciones de seguridad, los sistemas el\u00e9ctricos, las pruebas de carga, el recubrimiento y la inspecci\u00f3n visual.<\/li>\n<\/ol>\n\n\n\n<p>Estos dos marcos normativos desempe\u00f1an funciones distintas pero complementarias y, en conjunto, constituyen los requisitos de entrada obligatorios para la adquisici\u00f3n de gr\u00faas en el sector energ\u00e9tico de Sri Lanka.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Aspectos destacados de la soluci\u00f3n personalizada y la implementaci\u00f3n para gr\u00faas puente<\/h2>\n\n\n\n<p>La gr\u00faa puente fue dise\u00f1ada y fabricada siguiendo estrictamente la norma BS 466:1984, con especial atenci\u00f3n a la resistencia a la corrosi\u00f3n para condiciones costeras.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Dise\u00f1o estructural de gr\u00faas puente<\/h3>\n\n\n\n<ul>\n<li>Configurada como una gr\u00faa puente monorra\u00edl europea de 7,5 toneladas, en estricta conformidad con las especificaciones de la licitaci\u00f3n.<\/li>\n\n\n\n<li>La viga principal adopta una estructura de caja de acero plano laminado en caliente de 16 mm.<\/li>\n\n\n\n<li>Soldadura inspeccionada mediante ensayos radiogr\u00e1ficos (RT) y ensayos ultras\u00f3nicos (UT), cumpliendo con los est\u00e1ndares de resistencia y rigidez requeridos.<\/li>\n\n\n\n<li>La rigidez y la deformaci\u00f3n generales cumplen con las normas DIN\/FEM.<\/li>\n\n\n\n<li>Transiciones estructurales suaves en las esquinas para reducir la concentraci\u00f3n de tensiones.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1191\" height=\"563\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Structural-Design.png\" alt=\"\" class=\"wp-image-11380\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Seguridad y mecanismos<\/h3>\n\n\n\n<ul>\n<li>Interruptores de l\u00edmite de elevaci\u00f3n de doble etapa<\/li>\n\n\n\n<li>Gancho cerrado giratorio de 360\u00b0 con pestillo de seguridad<\/li>\n\n\n\n<li>Amortiguadores para gr\u00faas y vagones con protecci\u00f3n contra descarrilamientos<\/li>\n\n\n\n<li>Mecanismo de elevaci\u00f3n equipado con freno de seguridad (frenado por desconexi\u00f3n de energ\u00eda).<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Sistema el\u00e9ctrico<\/h3>\n\n\n\n<ul>\n<li>Clase de protecci\u00f3n: IP65<\/li>\n\n\n\n<li>Motores con protecci\u00f3n t\u00e9rmica integrada<\/li>\n\n\n\n<li>rel\u00e9 de protecci\u00f3n contra fallas de fase (PFR)<\/li>\n\n\n\n<li>Sistema de alimentaci\u00f3n por cable fest\u00f3n con componentes de suspensi\u00f3n de acero inoxidable.<\/li>\n\n\n\n<li>Placa de identificaci\u00f3n original en ingl\u00e9s<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-scaled.jpg\" alt=\"\" class=\"wp-image-11381\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-scaled.jpg\" alt=\"\" class=\"wp-image-11382\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Prueba de carga<\/h3>\n\n\n\n<ul>\n<li>Prueba de carga est\u00e1tica: 1,25 veces la capacidad nominal<\/li>\n\n\n\n<li>Se entrega con un certificado de conformidad para gr\u00faa puente en el momento de la entrega desde la f\u00e1brica.<\/li>\n\n\n\n<li>Super\u00f3 la prueba de admisi\u00f3n con \u00e9xito en un solo intento.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-2 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"630\" height=\"891\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Certificate-of-Conformity1.png\" alt=\"\" class=\"wp-image-11383\"\/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"632\" height=\"890\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Certificate-of-Conformity2.png\" alt=\"\" class=\"wp-image-11384\"\/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Dise\u00f1o anticorrosi\u00f3n costero<\/h2>\n\n\n\n<p>Para hacer frente a las condiciones de alta humedad y bruma salina del entorno costero de Sri Lanka, se implementaron las siguientes mejoras, adem\u00e1s de los requisitos de la norma BS 466:1984:<\/p>\n\n\n\n<ol>\n<li>Tratamiento de superficie: Pretratamiento del acero para mejorar la adherencia del recubrimiento.<\/li>\n\n\n\n<li>Recubrimiento protector: Se aplic\u00f3 una capa protectora anticorrosi\u00f3n a toda la gr\u00faa.<\/li>\n\n\n\n<li>Cable de acero: Cable de acero galvanizado de alta resistencia que cumple con las especificaciones.<\/li>\n\n\n\n<li>Elementos de fijaci\u00f3n: Todos los componentes son de acero inoxidable para evitar la corrosi\u00f3n.<\/li>\n\n\n\n<li>Protecci\u00f3n el\u00e9ctrica: Dise\u00f1o sellado IP65 para minimizar la entrada de humedad.<\/li>\n<\/ol>\n\n\n\n<p>Estas medidas mejoran significativamente la estabilidad operativa y la vida \u00fatil en entornos costeros.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-3 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-scaled.jpg\" alt=\"\" class=\"wp-image-11385\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-scaled.jpg\" alt=\"\" class=\"wp-image-11386\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Entrega integral para proyectos de licitaci\u00f3n de CEB<\/h2>\n\n\n\n<p>El proyecto se entreg\u00f3 cumpliendo \u00edntegramente los procedimientos de CEB, incluidos:<\/p>\n\n\n\n<ul>\n<li>Preparaci\u00f3n y presentaci\u00f3n de los documentos de licitaci\u00f3n.<\/li>\n\n\n\n<li>Dise\u00f1o, fabricaci\u00f3n e inspecci\u00f3n seg\u00fan la norma BS 466:1984.<\/li>\n\n\n\n<li>Log\u00edstica segura desde el puerto de Qingdao hasta el puerto de Colombo.<\/li>\n\n\n\n<li>Instalaci\u00f3n de rieles, montaje de vigas y cableado el\u00e9ctrico.<\/li>\n\n\n\n<li>Coordinaci\u00f3n de las pruebas de carga in situ y la aceptaci\u00f3n con CEB.<\/li>\n\n\n\n<li>Entrega de la documentaci\u00f3n completa: certificados, informes de ensayos no destructivos, informes de pruebas y manuales de instalaci\u00f3n.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-4 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1.jpg\" alt=\"\" class=\"wp-image-11387\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2.jpg\" alt=\"\" class=\"wp-image-11388\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3.jpg\" alt=\"\" class=\"wp-image-11389\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Resultados del proyecto<\/h2>\n\n\n\n<ol>\n<li><strong>Cumplimiento de las normas de licitaci\u00f3n de CEB<\/strong>Todos los procesos comerciales, la ejecuci\u00f3n de contratos y los procedimientos de aceptaci\u00f3n han sido aprobados en su totalidad.<\/li>\n\n\n\n<li><strong>Cumplimiento de la norma BS 466:1984<\/strong>La estructura, la seguridad, los sistemas el\u00e9ctricos y las pruebas cumplen con los requisitos est\u00e1ndar.<\/li>\n\n\n\n<li><strong>Resistencia a la corrosi\u00f3n<\/strong>El equipo funciona de manera fiable en condiciones costeras de alta humedad y niebla salina.<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-5 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"719\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-installation1.jpg\" alt=\"\" class=\"wp-image-11390\" style=\"object-fit:cover;width:414px;height:200px\"\/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"719\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-installation2.jpg\" alt=\"\" class=\"wp-image-11391\" style=\"object-fit:cover;width:414px;height:200px\"\/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Capacidad de la gr\u00faa KUANGSHAN para proyectos similares<\/h2>\n\n\n\n<p>El proyecto de la gr\u00faa puente europea de 7,5 toneladas en la central el\u00e9ctrica de Lakvijaya es un caso representativo de KUANGSHAN CRANE en la ejecuci\u00f3n de proyectos de licitaci\u00f3n que cumplen con los requisitos para la industria energ\u00e9tica del sur de Asia, en particular en condiciones de corrosi\u00f3n costera.<\/p>\n\n\n\n<p>Gracias a nuestra s\u00f3lida experiencia en est\u00e1ndares internacionales, ingenier\u00eda personalizada, control de calidad integral y sistemas de servicio transfronterizos, ayudamos a nuestros clientes a lograr una adquisici\u00f3n que cumpla con la normativa, una aceptaci\u00f3n sin problemas y un funcionamiento estable, garantizando as\u00ed un soporte fiable para el manejo de materiales que garantice la seguridad de la central el\u00e9ctrica.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ofrecemos soluciones consolidadas para:<\/h3>\n\n\n\n<ul>\n<li>Proyectos de gr\u00faas adjudicados mediante licitaci\u00f3n en centrales el\u00e9ctricas, f\u00e1bricas y almacenes.<\/li>\n\n\n\n<li>Soluciones personalizadas para entornos costeros, de alta humedad, con niebla salina y polvorientos.<\/li>\n\n\n\n<li>Entrega integral: suministro + instalaci\u00f3n + puesta en marcha + pruebas de carga<\/li>\n\n\n\n<li>Servicios de log\u00edstica de exportaci\u00f3n y despacho de aduanas para Sri Lanka, el sur de Asia y el sudeste asi\u00e1tico.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"This case involves a complete delivery project by KUANGSHAN CRANE for a 7.5-ton European single girder overhead crane supplied to the electrical equipment warehouse of the Lakvijaya Power Station in Sri Lanka. The project strictly complied with the tender specification LV\/T\/2024\/0001 issued by the Ceylon Electricity Board (CEB). Technical design and acceptance were executed in [&hellip;]","protected":false},"featured_media":11379,"parent":0,"menu_order":0,"template":"single-projects.php","posts_category":[18],"posts_tag":[121,312],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/xmxposts\/11377"}],"collection":[{"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/xmxposts\/11377\/revisions"}],"predecessor-version":[{"id":11393,"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/xmxposts\/11377\/revisions\/11393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/media\/11379"}],"wp:attachment":[{"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/media?parent=11377"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/posts_category?post=11377"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/es\/wp-json\/wp\/v2\/posts_tag?post=11377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}