{"id":11377,"date":"2026-04-11T06:16:35","date_gmt":"2026-04-11T06:16:35","guid":{"rendered":"https:\/\/www.kscranegroup.com\/?post_type=posts&#038;p=11377"},"modified":"2026-04-11T06:16:38","modified_gmt":"2026-04-11T06:16:38","slug":"overhead-crane-for-srilanka-power-plant","status":"publish","type":"posts","link":"https:\/\/www.kscranegroup.com\/ms\/posts\/overhead-crane-for-srilanka-power-plant\/","title":{"rendered":"Kren Atas 7.5 Tan untuk Loji Janakuasa Sri Lanka: Patuh CEB &amp; Anti-Kakisan"},"content":{"rendered":"<p>Kes ini melibatkan projek penghantaran lengkap oleh KUANGSHAN CRANE untuk 7.5 tan <a href=\"https:\/\/www.kscranegroup.com\/ms\/single-girder-overhead-cranes\/\">Kren atas galang tunggal Eropah<\/a> dibekalkan ke gudang peralatan elektrik Stesen Janakuasa Lakvijaya di Sri Lanka.<\/p>\n\n\n\n<p>Projek ini mematuhi spesifikasi tender LV\/T\/2024\/0001 yang dikeluarkan oleh Lembaga Elektrik Ceylon (CEB). Reka bentuk dan penerimaan teknikal telah dilaksanakan mengikut BS 466:1984, piawaian untuk kren pengembaraan atas elektrik am. Di samping itu, penyesuaian anti-karat khusus telah dilaksanakan untuk menangani keadaan kelembapan tinggi dan semburan garam tinggi di sepanjang wilayah pantai barat Sri Lanka.<\/p>\n\n\n\n<p>Daripada reka bentuk, pembuatan, pemeriksaan dan logistik kepada pemasangan, pentauliahan dan pengujian beban, projek ini telah dilaksanakan melalui proses gelung tertutup sepenuhnya. Peralatan tersebut berjaya melepasi penerimaan rasmi CEB dalam satu percubaan dan kini beroperasi dengan andal di gudang stesen janakuasa.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Latar Belakang Projek: Projek Tender Industri Tenaga Sri Lanka<\/h2>\n\n\n\n<p>Perolehan ini merupakan sebahagian daripada tender rasmi yang dikeluarkan oleh Lembaga Elektrik Ceylon (CEB), yang dipohon untuk pangkalan kuasa terma kebangsaan utama\u2014gudang peralatan elektrik Stesen Janakuasa Lakvijaya.<\/p>\n\n\n\n<ul>\n<li>Senario aplikasi: Pengendalian peralatan elektrik di dalam bangunan<\/li>\n\n\n\n<li>Keadaan persekitaran: Kawasan pantai dengan kelembapan tinggi dan semburan garam yang tinggi<\/li>\n\n\n\n<li>Kekangan projek: Mesti mematuhi prosedur tender CEB dan piawaian teknikal BS 466:1984 secara serentak<br><\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Pematuhan Tender CEB<\/h3>\n\n\n\n<p>Projek ini dilaksanakan mengikut:<\/p>\n\n\n\n<ol>\n<li>Spesifikasi Tender CEB LV\/T\/2024\/0001<br>Meliputi prosedur pembidaan, pelaksanaan kontrak, jaminan prestasi, pencapaian pembayaran dan proses penerimaan rasmi.<\/li>\n\n\n\n<li>BS 466:1984 Standard untuk Kren Perjalanan Atas Elektrik<br>Meliputi reka bentuk struktur, keperluan pembuatan, toleransi pemasangan, konfigurasi keselamatan, sistem elektrik, ujian beban, salutan dan pemeriksaan visual.<\/li>\n<\/ol>\n\n\n\n<p>Kedua-dua rangka kerja ini memainkan peranan yang berbeza tetapi saling melengkapi dan bersama-sama membentuk syarat kemasukan mandatori untuk perolehan kren dalam industri kuasa Sri Lanka.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Penyelesaian Tersuai dan Sorotan Pelaksanaan untuk Kren Atas<\/h2>\n\n\n\n<p>Kren atas direka bentuk dan dihasilkan mengikut BS 466:1984, dengan tumpuan yang dipertingkatkan pada rintangan kakisan untuk keadaan pantai.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Reka Bentuk Struktur Kren Atas<\/h3>\n\n\n\n<ul>\n<li>Dikonfigurasikan sebagai kren overhead girder tunggal Eropah 7.5 tan mengikut spesifikasi tender yang ketat<\/li>\n\n\n\n<li>Girder utama menggunakan struktur kotak keluli rata gulung panas 16 mm<\/li>\n\n\n\n<li>Kimpalan diperiksa melalui Ujian Radiografi (RT) dan Ujian Ultrasonik (UT), memenuhi piawaian kekuatan dan ketegaran yang diperlukan<\/li>\n\n\n\n<li>Kekakuan dan ubah bentuk keseluruhan mematuhi piawaian DIN\/FEM<\/li>\n\n\n\n<li>Peralihan struktur yang lancar di sudut untuk mengurangkan kepekatan tekanan<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1191\" height=\"563\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Structural-Design.png\" alt=\"\" class=\"wp-image-11380\"\/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Keselamatan dan Mekanisme<\/h3>\n\n\n\n<ul>\n<li>Suis had pengangkat dua peringkat<\/li>\n\n\n\n<li>Cangkuk tertutup berputar 360\u00b0 dengan selak keselamatan<\/li>\n\n\n\n<li>Penampan kren dan troli dengan perlindungan gelinciran<\/li>\n\n\n\n<li>Mekanisme pengangkat dilengkapi dengan brek selamat gagal (brek mati kuasa)<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">Sistem Elektrik<\/h3>\n\n\n\n<ul>\n<li>Kelas perlindungan: IP65<\/li>\n\n\n\n<li>Motor dengan perlindungan haba terbina dalam<\/li>\n\n\n\n<li>Relay perlindungan kegagalan fasa (PFR)<\/li>\n\n\n\n<li>Sistem bekalan kuasa kabel festoon dengan komponen penggantungan keluli tahan karat<\/li>\n\n\n\n<li>Papan nama asal Inggeris<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-1 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-scaled.jpg\" alt=\"\" class=\"wp-image-11381\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist1-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-scaled.jpg\" alt=\"\" class=\"wp-image-11382\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Electrical-System-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h3 class=\"wp-block-heading\">Ujian Beban<\/h3>\n\n\n\n<ul>\n<li>Ujian beban statik: 1.25 kali ganda kapasiti undian<\/li>\n\n\n\n<li>Dibekalkan dengan Sijil Pematuhan Kren Atas setelah Penghantaran dari Kilang<\/li>\n\n\n\n<li>Berjaya lulus penerimaan dalam satu percubaan<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-2 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"630\" height=\"891\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Certificate-of-Conformity1.png\" alt=\"\" class=\"wp-image-11383\"\/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"632\" height=\"890\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Overhead-Crane-Certificate-of-Conformity2.png\" alt=\"\" class=\"wp-image-11384\"\/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Reka Bentuk Anti-Karat Pantai<\/h2>\n\n\n\n<p>Bagi menangani kelembapan yang tinggi dan keadaan semburan garam di persekitaran pantai Sri Lanka, penambahbaikan berikut telah dilaksanakan melangkaui keperluan BS 466:1984:<\/p>\n\n\n\n<ol>\n<li>Rawatan Permukaan: Pra-rawatan keluli untuk meningkatkan lekatan salutan<\/li>\n\n\n\n<li>Salutan Pelindung: Lapisan atas anti-karat disapu pada seluruh kren<\/li>\n\n\n\n<li>Tali Dawai: Tali dawai keluli tergalvani berkekuatan tinggi yang mematuhi spesifikasi<\/li>\n\n\n\n<li>Pengikat: Semua komponen keluli tahan karat untuk mencegah kakisan<\/li>\n\n\n\n<li>Perlindungan Elektrik: Reka bentuk kedap IP65 untuk meminimumkan kemasukan lembapan<\/li>\n<\/ol>\n\n\n\n<p>Langkah-langkah ini meningkatkan kestabilan operasi dan jangka hayat perkhidmatan dengan ketara dalam persekitaran pesisir pantai.<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-3 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-scaled.jpg\" alt=\"\" class=\"wp-image-11385\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Coastal-Anti-Corrosion-Design-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"2560\" height=\"1920\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-scaled.jpg\" alt=\"\" class=\"wp-image-11386\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-scaled.jpg 2560w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-1536x1152.jpg 1536w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-hoist2-2048x1536.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Penghantaran Sehenti untuk Projek Tender CEB<\/h2>\n\n\n\n<p>Projek ini telah dilaksanakan dengan mematuhi sepenuhnya prosedur CEB, termasuk:<\/p>\n\n\n\n<ul>\n<li>Penyediaan dan penyerahan dokumen bidaan<\/li>\n\n\n\n<li>Reka bentuk, pembuatan dan pemeriksaan mengikut BS 466:1984<\/li>\n\n\n\n<li>Logistik selamat dari Pelabuhan Qingdao ke Pelabuhan Colombo<\/li>\n\n\n\n<li>Pemasangan rel, pemasangan girder dan pendawaian elektrik<\/li>\n\n\n\n<li>Penyelarasan ujian beban di tapak dan penerimaan dengan CEB<\/li>\n\n\n\n<li>Penyerahan dokumentasi lengkap: sijil, laporan NDT, laporan ujian dan manual pemasangan<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-4 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1.jpg\" alt=\"\" class=\"wp-image-11387\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping1-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2.jpg\" alt=\"\" class=\"wp-image-11388\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping2-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"1704\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3.jpg\" alt=\"\" class=\"wp-image-11389\" style=\"object-fit:cover;width:275px;height:330px\" srcset=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3.jpg 1280w, https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-Packaging-and-shipping3-1154x1536.jpg 1154w\" sizes=\"(max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Hasil Projek<\/h2>\n\n\n\n<ol>\n<li><strong>Pematuhan Tender CEB<\/strong>Semua proses komersial, pelaksanaan kontrak dan prosedur penerimaan diluluskan sepenuhnya<\/li>\n\n\n\n<li><strong>Pematuhan BS 466:1984<\/strong>Struktur, keselamatan, sistem elektrik dan pengujian semuanya memenuhi keperluan standard<\/li>\n\n\n\n<li><strong>Rintangan Kakisan<\/strong>Peralatan berfungsi dengan andal di bawah keadaan kelembapan tinggi pantai dan semburan garam<\/li>\n<\/ol>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-5 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"719\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-installation1.jpg\" alt=\"\" class=\"wp-image-11390\" style=\"object-fit:cover;width:414px;height:200px\"\/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"719\" src=\"https:\/\/www.kscranegroup.com\/wp-content\/uploads\/2026\/04\/7.5-Ton-Overhead-Crane-for-Sri-Lanka-Power-Plant-installation2.jpg\" alt=\"\" class=\"wp-image-11391\" style=\"object-fit:cover;width:414px;height:200px\"\/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Keupayaan KREN KUANGSHAN untuk Projek Serupa<\/h2>\n\n\n\n<p>Projek kren atas Eropah seberat 7.5 tan di Stesen Janakuasa Lakvijaya merupakan contoh terbaik KUANGSHAN CRANE dalam penyampaian projek tender yang mematuhi piawaian untuk industri kuasa Asia Selatan, terutamanya di bawah keadaan kakisan pantai.<\/p>\n\n\n\n<p>Dengan kepakaran yang kukuh dalam piawaian antarabangsa, kejuruteraan tersuai, kawalan kualiti proses penuh dan sistem perkhidmatan rentas sempadan, kami membantu pelanggan mencapai perolehan yang mematuhi piawaian, penerimaan yang lancar dan operasi yang stabil\u2014memastikan sokongan pengendalian bahan yang andal untuk keselamatan loji janakuasa.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Kami menyediakan penyelesaian matang untuk:<\/h3>\n\n\n\n<ul>\n<li>Projek kren berasaskan tender di loji janakuasa, kilang dan gudang<\/li>\n\n\n\n<li>Penyelesaian tersuai untuk persekitaran pantai, kelembapan tinggi, semburan garam dan berdebu<\/li>\n\n\n\n<li>Penghantaran bersepadu: bekalan + pemasangan + pentauliahan + ujian beban<\/li>\n\n\n\n<li>Logistik eksport dan sokongan pelepasan kastam untuk Sri Lanka, Asia Selatan dan Asia Tenggara<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"This case involves a complete delivery project by KUANGSHAN CRANE for a 7.5-ton European single girder overhead crane supplied to the electrical equipment warehouse of the Lakvijaya Power Station in Sri Lanka. The project strictly complied with the tender specification LV\/T\/2024\/0001 issued by the Ceylon Electricity Board (CEB). Technical design and acceptance were executed in [&hellip;]","protected":false},"featured_media":11379,"parent":0,"menu_order":0,"template":"single-projects.php","posts_category":[18],"posts_tag":[121,312],"acf":[],"_links":{"self":[{"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/xmxposts\/11377"}],"collection":[{"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/xmxposts"}],"about":[{"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/types\/posts"}],"version-history":[{"count":3,"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/xmxposts\/11377\/revisions"}],"predecessor-version":[{"id":11393,"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/xmxposts\/11377\/revisions\/11393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/media\/11379"}],"wp:attachment":[{"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/media?parent=11377"}],"wp:term":[{"taxonomy":"posts_category","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/posts_category?post=11377"},{"taxonomy":"posts_tag","embeddable":true,"href":"https:\/\/www.kscranegroup.com\/ms\/wp-json\/wp\/v2\/posts_tag?post=11377"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}